fbpx
Skip to main content

Designs for East Side Fire/EMS Station Presented

SARATOGA SPRINGS — A schematic design of the proposed Fire/EMS Station 3 was presented to the city this week. 

The one-story building measures 15,500 square feet, features dark green siding with white trim, and will be centered on a 2.4-acre parcel the city is leasing from the state at the east end of the Oklahoma Training Track property, with a drive-in entry on Henning Road. 

The city’s two other stations are located in close proximity downtown, and on the west side, respectively. Station 3 will largely serve residents on the city’s east side.

Review of the design will be referred to the city Planning Board and Design Review Commission for their advisory opinions. 

Environmental assessments are anticipated to be completed in July to be followed by the completion of final detailed building plans in January 2022. If that timeline stays true, the city can start receiving bids in February 2022 with construction to begin two months later.